This guide is general information, not legal advice. Laws and court decisions change. Consult a licensed attorney.
Please Read This First
This is general information, not legal advice. Your settlement agreement controls what you must do and by when. Read it with your attorney before relying on anything here.
A settlement ends the lawsuit. It does not end the obligation. Most agreements commit the owner to specific corrections by specific dates, and most can be enforced if the work is late, incomplete or done incorrectly. Separately, nothing in a settlement with one plaintiff prevents a different person from filing a new claim about the same property. The weeks after signing are when both risks are decided.
Phase 1
Know Exactly What You Agreed To (Week 1)
- Get the fully signed agreement and every exhibit, including any expert report it refers to
- List every correction the agreement requires, one line each
- Next to each, write the deadline. Note whether deadlines run from signing, from court approval or from permits
- Note any inspection, reporting or notice duties (for example, written notice of completion)
- Note what the agreement says about extensions, permits, weather and contractor delays
- Identify who is responsible for each item: you, your landlord or your tenant
- Calendar every date, with reminders at 60, 30 and 10 days
- Ask your attorney: does the court keep jurisdiction to enforce this, and for how long?
Phase 2
Turn The List Into A Plan (Weeks 1 To 3)
A settlement list is written by lawyers from a complaint or an inspection. It says what to fix, not how. Before a contractor touches anything:
- Have each listed condition measured as it exists today
- For each, write the target dimension from the 2010 ADA Standards and, in Florida, the Florida Accessibility Code
- Flag items that affect each other (moving a toilet changes grab bar, dispenser and clearance locations)
- Flag items that need a permit
- Identify conditions that are not in the agreement but would support a new claim
- Sequence the work: parking and route first, then entrance, then interior, then restrooms
- Get written scopes from contractors that state the finished dimensions, not just "make ADA compliant"
Why go beyond the agreement. The Department of Justice's priority order for existing buildings starts with access from parking and sidewalks, then access to goods and services, then restrooms (28 CFR 36.304(c)). A property that corrects the six items in its settlement and leaves a seventh visible from the parking lot has paid for a lawsuit without ending its exposure.
Phase 3
Do The Work & Check It (As Scheduled)
- Photograph every condition before work begins, with a tape or level in the frame
- Inspect each item before the contractor leaves the site; tolerances are small and rework is cheapest now
- Photograph every finished condition the same way
- Keep invoices itemized by correction
- Keep permits and final inspection sign-offs
- If a deadline is at risk, tell your attorney before it passes, not after
Common Ways Corrected Work Fails
- Grab bars at the right height on the wrong wall, or the right wall at the wrong length
- A new accessible space striped 8 feet wide in Florida, where 12 is required
- A new curb ramp that projects into the access aisle
- A ramp at 1:10 because the run was a foot short
- A new sign mounted below 60 inches
- A lowered counter immediately covered with displays
Phase 4
Document Completion
When the work is finished, assemble one file:
- The list from Phase 1, with a completion date beside each item
- Before and after photographs, labeled to match the list
- Measurements of each finished condition and the standard it meets
- Invoices, permits and inspection sign-offs
- A dated statement from the person who verified the work
- Any notice of completion the agreement requires, sent the way the agreement requires
A Remediation Status Report from an independent consultant puts all of this in one document: what was required, what was corrected, what remains and why. It is what your attorney sends to the other side, and it is what you produce if the property is ever challenged again.
Phase 5
Consider A Florida Filing
Florida law allows an owner whose property has been inspected by a qualified expert to file with the Department of Business and Professional Regulation either a certification of conformity (valid three years) or a remediation plan with dated corrective measures (Florida Statutes s. 553.5141). The Department keeps a public registry.
In a later Title III case brought in Florida, the statute directs the court to consider a filing made before that complaint when deciding whether the complaint was filed in good faith and whether the plaintiff is entitled to attorney's fees and costs.
For a property that has just been corrected and documented, most of the work behind such a filing is already done. Ask your attorney whether it makes sense.
Phase 6
Keep It Compliant
Federal rules require accessible features to be maintained in operable working condition (28 CFR 36.211). Most second claims are about maintenance, not construction.
| EVERY | CHECK |
|---|---|
| Month | Access aisles clear; signs in place; restroom clear floor space free of storage; lowered counter clear |
| Six months | Striping and blue outline visible; door closers still at 5 seconds and 5 pounds; ramps and walks free of new cracks and lips |
| Any restriping or repaving | Re-measure every accessible space, aisle and slope before paying the contractor |
| Any renovation or new tenant | Review plans for accessibility before work starts. Alterations must comply with the 2010 Standards, and an alteration to a primary function area can require improvements to the path of travel serving it, up to 20 percent of the alteration cost (28 CFR 36.403) |
| Three years | Re-evaluate; renew any certification of conformity |
Train the people on site. A manager who knows not to put the trash can beside the toilet, not to stack stock in the access aisle and not to let a landscaper remove a sign prevents more claims than any contractor.
Recovering Some Of The Cost
Ask your accountant about the federal Disabled Access Credit (up to $5,000 a year for eligible small businesses) and the barrier removal deduction (up to $15,000 a year for any business). The file from Phase 4 is the documentation those incentives need.
How National ADA-ACN Helps
- Remediation Roadmap: the settlement list turned into measured, sequenced scopes of work
- Verification inspections before the contractor is paid
- Remediation Status Report for your attorney and your records
- Periodic re-evaluation
We have supported more than 1,500 matters over 15+ years.
Sources
- 28 CFR 36.211, 36.304, 36.403: ecfr.gov, Title 28, Part 36
- Florida Statutes s. 553.5141 and s. 553.5041: flsenate.gov
- 2010 ADA Standards for Accessible Design: ada.gov
- U.S. Department of Justice, "Tax Incentives for Businesses": ada.gov/resources/tax-incentives-businesses