Guide · For Attorneys

Working With An Accessibility Expert: From Filing To Resolution

What to send, what to expect and when.

This guide is general information, not legal advice. Laws and court decisions change. Consult a licensed attorney.

Property facts drive ADA matters. The location of the alleged barrier, the measured condition, the route, the entrance, the restroom element, the parking layout and the remediation status all shape strategy. This guide sets out when to bring in an accessibility expert, what to send, and what to expect back at each stage of a Title III case in Florida's federal courts.

General information for counsel. Local rules and individual judges' orders vary and control.

Why Speed Matters In Florida

Florida was the second most active state for federal ADA Title III filings in 2025, with 1,823 cases (Seyfarth Shaw LLP, February 2026). In the busiest districts these cases are often put on an accelerated track: early disclosures of the alleged barriers, an early inspection of the property, and prompt mediation. A defendant typically has 21 days from service to respond under Rule 12. The window in which a site inspection can inform the first strategic decisions is short.

Stage By Stage

Stage 1

Demand Letter Or Service Of The Complaint (Days 1 To 14)

Counsel's questions. Are the allegations accurate? Who controls each area? Is this a property that can be corrected quickly?

What the expert does. A Claim-Focused Review: a site inspection limited to the conditions alleged, each measured and photographed, with a short table for counsel.

What You Get

ALLEGATIONMEASURED CONDITIONREQUIREMENTSTATUS
Complaint para. 14(a): no van-accessible spaceOne accessible space, 12 ft wide, 5 ft aisle, no van signVan sign required; dimensions meet Florida and federal van optionPartly accurate: sign only
Para. 14(b): restroom door too narrow33 inches clear32 inches minimumUnsupported
Para. 14(c): no rear grab barNone present36 inches minimum, 33 to 36 inches highAccurate

That table usually decides the first move.

Stage 2

Before The Response Is Due (Days 7 To 21)

Counsel's questions. Answer, move or negotiate? Remediate now?

What The Expert Does

  • Identifies which standard applies to each element (construction and alteration dates; 1991 safe harbor under 28 CFR 36.304(d)(2)).
  • Separates landlord-controlled from tenant-controlled conditions, which matters where both are named or where one will tender to the other. Both are public accommodations under 28 CFR 36.201(b); the lease allocates between them.
  • Estimates what correction involves: which items are paint, signs and hardware, and which are concrete or plumbing.

Decision point: remediation. A private Title III plaintiff's substantive remedy is injunctive. Where conditions can be permanently corrected, counsel may consider remediating and moving to dismiss as moot. The Eleventh Circuit's voluntary-cessation standard is stringent (Sheely v. MRI Radiology Network, 505 F.3d 1173 (11th Cir. 2007)). Florida district courts have found mootness where structural modifications were completed and supported by an expert's inspection, and have declined where the defendant only promised changes. The expert's role is to make sure the work actually meets the standard and to supply the declaration and photographs that prove it.

Stage 3

Early Inspection & Disclosures (Weeks 3 To 8)

The plaintiff's inspection. Expect a Rule 34 request to enter and inspect, often with the plaintiff's expert. Having your own expert attend means the same conditions are measured at the same time by both sides, and disputes about method are identified on site.

Scope. A whole-property evaluation at this point is often wise even though the complaint is narrower. Complaints are amended after inspections, and the plaintiff's expert will not confine the visit to the pleaded items.

What you get. A Litigation Defense Report, in the form counsel directs: executive summary, claim-specific review, photographs, measurements and field notes, conditions organized by area, remediation commentary, prioritization, exhibits.

Stage 4

Mediation & Negotiation (Weeks 6 To 16)

Counsel's questions. What should the injunctive terms be? How long does the client really need?

What The Expert Does

  • Drafts the technical scope of work for the agreement: each item, the target dimension and a realistic completion period that accounts for permits and sequencing.
  • Flags terms that are impossible or unnecessarily expensive (for example, a demand to re-grade where relocating the spaces solves the slope).
  • Reviews the plaintiff's expert report on standard applied, method and current status.

A settlement that attaches a specific, measured scope is easier to perform and harder to dispute later than one that requires the property to be "brought into compliance".

Stage 5

Expert Discovery (If The Case Continues)

Disclosures. A retained testifying expert provides a written report under Rule 26(a)(2)(B): the opinions and their bases, the facts and data considered, exhibits, qualifications and publications, prior testimony for four years, and compensation.

Consulting versus testifying. An expert retained only to consult, and not expected to testify, is generally shielded from discovery under Rule 26(b) (4)(D) absent exceptional circumstances. Many defense teams begin with a consulting engagement and decide later whether to designate. If that is the plan, tell the expert at the outset; it affects what is put in writing and when.

Rebuttal. A rebuttal review tests the opposing report: Did it apply the right edition of the Standards? Are slopes supported by multiple readings? Were widths measured correctly? Do the conditions still exist? Does it state legal conclusions in place of measurements?

Admissibility. An expert's opinions must rest on sufficient facts and reliable methods reliably applied (Federal Rule of Evidence 702). In practice that means calibrated instruments, a documented method, photographs that show the measurement, and opinions that stay within the technical question.

Stage 6

Summary Judgment & Trial

What the expert does. Declarations supporting or opposing summary judgment; updated inspection shortly before the motion or trial, because conditions change; demonstrative exhibits (annotated photographs, site plans); testimony.

A recurring issue. Whether removal of a particular barrier is "readily achievable" (28 CFR 36.304(a)). The expert supplies the technical side: what the correction physically requires, what it affects and what alternatives exist. Counsel should confirm the current allocation of burdens on this issue in the circuit.

Stage 7

After Resolution

  • Verification inspection before the contractor is paid.
  • Remediation Status Report documenting each corrected item, for delivery under the agreement and for the file.
  • Florida filing. A certification of conformity or remediation plan under Florida Statutes s. 553.5141, prepared by a qualified expert and filed with DBPR, must be considered by a court in a later Florida Title III action when it was filed before that complaint, on the questions of good faith and entitlement to fees. For a client who has just been sued once, it is worth discussing.

What To Send The Expert On Day One

ITEMWHY
Complaint or demand letterDefines the first scope
Scheduling order and any standing ADA orderSets the inspection and report deadlines
Property address, site plan, tenant rosterEstablishes what is common area and what is tenant space
Lease provisions on maintenance, alterations and compliance with lawsAllocation between landlord and tenant
Year built; permits and dates for alterations, restriping and renovationsDetermines the applicable standard and any safe harbor
Prior reports, prior claims and prior settlement agreementsExisting obligations and history
Any corrections made since the alleged visitCurrent status
Who will meet the inspector on siteAccess to restrooms, back-of-house and roof-level parking

Engagement Terms To Settle Up Front

  • Who retains. Retention by counsel, not the client, is the norm.
  • Role. Consulting or testifying, and whether that may change.
  • Written work product. What is written, when, and to whom it is addressed.
  • Scope. Claim-focused or whole property.
  • Turnaround. Timing and pricing depend on the property's location and the complexity of the claims. Tell the expert the real deadline.
  • Conflicts. Other matters involving the same parties or counsel.

Choosing An Expert

  • Experience with the 1991 and 2010 Standards and the Florida Accessibility Code, not just one of them
  • A documented measurement method and calibrated instruments
  • Reports that state findings as measurements, with sections cited
  • Willingness to tell you which of your client's conditions are real
  • Prior testimony and how it held up
  • Whether the person qualifies as a "qualified expert" for a s. 553.5141 filing (the statute lists licensed engineers, architects, certain contractors and building officials, and persons whose remediation plan or testimony has been accepted by a federal court)

How National ADA-ACN Helps

Case assessment, site inspections and documentation, expert reports, rebuttal and peer reviews, deposition and testimony support, and settlement support. We have supported more than 1,500 matters over 15+ years.

Share the property, the claim and your timeline.

Sources

  • Federal Rules of Civil Procedure 12, 26(a)(2), 26(b)(4), 34; Federal Rule of Evidence 702
  • 28 CFR 36.201(b), 36.304: ecfr.gov
  • Florida Statutes s. 553.5141: flsenate.gov
  • Sheely v. MRI Radiology Network, P.A., 505 F.3d 1173 (11th Cir. 2007); Wagner v. Sobik, No. 6:17-cv-1783 (M.D. Fla. 2018)
  • Seyfarth Shaw LLP, 2025 ADA Title III filing report (Feb. 2026): adatitleiii.com

Guides

Related Guides

How To Read An Accessibility Report